 |
 |
 |
|
  |
 |
|
|
|
|
|
|

|
We were called upon to update the master bathroom in this home. Our homeowners loved the layout of their bathroom; but despised all of the pink and wanted to create a warmer feel. We removed the existing tub, shower, toilet, vanity, mirror and flooring. Then we painted the room, installed a new white tub, encompassed the tub with new ceramic tile to match the shower, and installed a new shower base and ceramic tile on the shower walls, a new comfort height toilet, new vanity cabinet, with individual mirrors, new flooring, new fixtures and lighting. Once completed our homeowners said it was just how they envisioned it and they couldn’t be happier with the results.
Click on the photographs below for a larger view
|
 |
 |
 |
 |
Before |
Before |
Before |
Before |
 |
 |
 |
 |
Before |
Before |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
|
After |
After |
After |
|
|

|
We were initially called upon to remodel the kitchen in this home and once the kitchen was completed the Homeowners were so thrilled with the results that asked us to come back and remodel their outdated bathroom. The remodeling of this bathroom began as any other, but we found out quickly that there was so much rotted wood in the plumbing wall that we had to remove approximately 5 foot of exterior wall and replace several floor joists to make this bathroom not only habitable but also safe. The Homeowners opted for a stand up shower instead of the traditional tub and a glass block window instead of the standard obscure glass window. Some of the finishing touches that really make this bathroom stand out are the beveled bead board Wainscot that was added to the walls, the cultured marble high rim sink, and the large shower head. The Homeowner added their own little decorating touches to finish this bathroom off and the results speak for themselves, but “Wow” does come to mind when viewing the pictures.
Click on the photographs below for a larger view
|
 |
 |
 |
 |
Before |
Before |
Before |
Before |
 |
 |
 |
 |
Before |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
|

|
We were called upon to not only update this bathroom, but to also make it ADA complaint. The homeowners knew they needed this bathroom to fit all of the criteria to make it an ADA complaint bathroom, but wanted to give it a modern look and we were happy to achieve their desired result. The bathtub was flown in from Germany and adds so much to the ambiance of the room. Once the bathtub was installed we installed ceramic tile around the three exposed walls of the tub to give it a custom finish. A step and hand rail was added to allow for easy access in and out of the bathtub. We also installed a piece of glass at the front of the bathtub for a complete look. Another feature of this bathroom was that we removed two walls to allow for more storage space. This allowed us to install a utility cabinet as well as a vanity for the additional storage space this family so desperately needed. We also installed a skylight to allow for more natural light in this space. Once complete the homeowners were thrilled with the results.
Click on the photographs below for a larger view
|
 |
 |
 |
 |
Before |
Before |
Before |
Before |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
|
 |
It was time for a change, so we were called upon to update this old bathroom. The homeowners knew they wanted something modern and fresh and that is exactly what we gave them. The homeowners received new fixtures, a new tub, new sink, new toilet, new lighting, just to name a few. The sink wall was built and the mirror was handmade by our carpenters right here in our shop. The tiles were carefully laid to give the homeowners a design of their own. The homeowners were delighted with the finished project, as were we.
Click on the photographs below for a larger view
|
 |
|
 |
|
Before |
Before |
Before |
Before |
 |
 |
 |
|
Before |
Before |
Before |
Before |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
|
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
|
 |
This homeowner came to us because they were unhappy with their bathroom which only had a small soaking tub and shower; it lacked any room for storage. Other than being small, their biggest complaint was that the bathroom, specifically the shower, was always cold. They were dissatisfied with the out-dated look of their current bathroom.
The new bathroom installed by W.E. Bilbrey featured a six foot long custom shower surrounded by tile imported from Italy. A heavy 3/8”glass door that swings both ways and a glass enclosure above the shower was installed. For added convenience, a seat and granite shelves were built in the shower itself. A floor heating system was installed in the custom shower base to solve the problem with the shower always being cold.
New cabinets and sinks with nickel-plated fixtures replaced the old, out-dated ones. A wall cabinet was added for extra storage space. To brighten things up, a new window was put in along with can-lighting.
The homeowner was delighted with their dream bathroom... bigger, brighter, modern, and warm!
Click on the photographs below for a larger view
|
|
|
|
|
 |
|
 |
|
Before |
Before |
Before |
Before |
 |
 |
 |
 |
In Progress |
In Progress |
In Progress |
In Progress |
 |
 |
 |
 |
 |
 |
After |
After |
After |
After |
After |
After |
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
This bathroom was original to the home. The bathtub and toilet area were separated by two half walls, which surrounded the sink. The half walls were removed to create one large bathroom area. This bathroom was demolished down to the wall studs and ceiling joist. We also removed a soffit to allow for more ceiling space. The homeowners received all new plumbing, electric, and insulation during the re-building phase of the construction. They also received all new drywall for both the walls and the ceiling. The original flooring was removed down to the subfloor to allow for new vinyl flooring. The ceramic tile that surrounds the entire bathroom is one feature that sets this bathroom apart from the rest. Another special feature that was created just for this bathroom was the mirror that was custom built here in our shop. Upon completion of this bathroom the homeowners were thrilled with the results and are now looking at other projects to do around their house.
Click on the photographs below for a larger view
|
 |
|
 |
|
Before |
Before |
Before |
Before |
 |
 |
 |
 |
Before |
Before |
Before |
Before |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
|
|
After |
After |
|
|
|
|
 |
This homeowner wanted an entirely new bathroom. Every item and fixture was removed and the area was transformed into a rejuvenating and refreshing refuge. A new, easily accessible shower and tub with ceramic walls was installed. A taller 34" vanity was put in for added convenience. The room was painted and a mirror with lighting accents was mounted. Coordinating vinyl flooring completed the modern look and feel of the room.
Click on the photographs below for a larger view |
 |
 |
 |
 |
Before |
Before |
Before |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
What can we say the before and after pictures speak for themselves. This bathroom was very outdated and the homeowner called upon us to make the necessary updates to make this bathroom livable. We completely gutted this bathroom down to the wall studs. The homeowner in all received new ½” drywall, bathtub/shower, vanity, mirror, lighting, toilet, flooring, boutique cabinet, and all new fixtures. The homeowner was so happy when we completed their bathroom that they called us back to replace their siding and windows.
Click on the photographs below for a larger view |
 |
 |
 |
 |
|
Before |
Before |
Before |
Before |
 |
 |
 |
 |
|
After |
After |
After |
 |
 |
|
|
|
After |
|
|
 |
We were called upon to make this bathroom more accessible for the homeowner. The homeowner was having a difficult time getting in and out of the bathtub, so we fixed this problem by installing a new stand up shower. We also updated the rest of the bathroom with a new vanity, mirror, lighting, toilet, flooring, boutique cabinet, and all new fixtures. Now the homeowner has the bathroom she loves.
Click on the photographs below for a larger view
|
 |
 |
 |
 |
Before |
Before |
Before |
Before |
 |
 |
 |
|
|
Before |
After |
After |
 |
 |
|
|
|
After |
|
|
 |
The purpose of this project was to modernize an out-dated bathroom. The old fashioned steel tub was removed, and a sterling bath and shower unit was installed. A new modern sink replaced the two out-dated and worn sinks. Nickel fixtures, mirrors and new lighting fixtures were installed to accent the area. The project was finished off with new ceramic tile floors, creating a real retreat for the homeowners.
Click on the photographs below for a larger view |
 |
 |
 |
 |
Before |
Before |
Before |
|
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
This bathroom is located in the basement of the home. The homeowners wanted to completely demolish it and add a brand new bathroom. We completely demo the walls and built a new bathroom the homeowner would be proud to show off. The homeowner received a new shower, new sink, custom built mirror, new lighting, a new built in shelf for storage, new ceramic tile flooring, just to name a few. Once this project was completed the homeowners was thrilled with the results.
Click on the photographs below for a larger view
|
 |
|
 |
|
Before |
Before |
Before |
Before |
 |
 |
 |
|
Before |
Before |
Before |
Before |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
|
 |
After |
After |
After |
After |
|
|
|
|
After |
After |
After |
After |
|
 |
Our Homeowners called upon us because they had a very specific problem. They had their bathroom remodel three months prior and the shower area was accumulating water. Upon of initial inspection we could see that the shower area was installed wrong and that in order to fix their problem we would have to gut the bathroom down to the wall studs & main subfloor. In order to comply with their accessibility needs we installed a Swanstone shower base, with a single threshold, a slide bar shower head, grab bars, a folding shower seat, a high rise toilet, pedestal sink and leveled out the floor for ease while maneuvering around in the room. Once completed our Homeowners said we gave them what they were expecting the first time they had their bathroom remodeled and that was peace of mind!
Click on the photographs below for a larger view |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
 |
 |
 |
 |
After |
After |
After |
After |
|
|
|